The Prime Minister and the Minister of Housing visited the completion of the new phase of the oxidation ponds project in the 10 of Ramadan City, in the presence of Eng. Ahmed Abu Shabana, Executive Chairman & CEO, and Eng. Adel Fathy, Supervisor of the 10 of Ramadan City and New Administrative Capital Execution Sector.       * Major General Dr. Ismail Kamal, Governor of Aswan, inaugurated and operated the Rafie Al-Akkad project for sustainable drinking water supply to the Lotus district.       

Home > Company Projects > Important Projects > Sanitary Drainage Works
Sanitary Drainage Plant and Its Expansions at El-Tall El-Kebeer City – Ismailia Governorate
Purification plant (STAGE I)
Sterilization , Sludge thickening & Final basins
Oxidation channels
Final sedimentation basins
Drying beds

Owner

:

National Organization for Potable Water & Sanitary Drainage

Starting Date

:

First Stage :1991
Expansions:2004

Value of Contract

:

146 millions L.E.

Description

:

• STAGE I:
 - PURIFICATION PLANT: built on an area of 12 fed., and works by surface ventilation horizontal mechanical method with production capacity of 10000 m3 / day.
- PUMPING STATIONS: (1) main station + (3) sub-stations.
- FORCE MAIN: Cast iron pipes of diameters (300: 600 mm) & length (3.5 km).
- GRAVITY NETWORKS: Glazed clay pipes of diameters (8: 36 ") & length (30 km).
- CROSSINGS : (2) Hydraulic power crossings, diameters : 1800 & 2250 mm.

• STAGE II:
 - EXPANSIONS OF PURIFICATION PLANT: to raise the capacity from 10 thousand to 20 thousand m3 / day .
- PUMPING STATIONS: (3) main station + (4) sub-station.
- FORCE MAIN: HDPE pipes of diameters (200: 500 mm) & length of 12 km. 
- GRAVITY NETWORKS: plastic pipes of diameters (6, 8,10 ") & length about 37 km.

 
Skip Navigation Links
MarchAprilMay
SunMonTueWedThuFriSat
12345
6789101112
13141516171819
20212223242526
27282930
 
◄ SEWAGE PURIFICATION PLANTS :-

• Sanitary Drainage for Masttal Villages - Quesna Post - Menoufeya Governorate.

• Sewage Treatment Plant for Meet Abu El Hassan Village and Sanitary Drainage for Meet Abu Shiekha and Meet Abu eL Hassan Villages - Quesna Post - Menoufeya Governorate.

• Excution of Networks Force Main and Pumping Station For Om Saber Village and its Followers Monshate Nasser Village - Behaire Governorate .

• Sewage Treatment Plant For EL Koum EL Ahmar Village Shebeen EL Kanater Post Qalyoubia Governorate .

• Supplementary Works To Transfer Sewage Water From Pumping Station NO.3 To EL Shorouk City Treatment Plant Capacity :60 Thousand M3/Day

• Expansions Works for Sanitary Drainge Pumping Station C at New Borg El Arab City

• Sanitry Drainage for Shabraweesh Cluster Age Post Dakahlia Governorate

• Supply and Installation of Main Drainage Lines for the First Phase of Mostakbal City Project .

◄ DRINKING WATER PURIFICATION PLANTS ;-

• Ground Tank and Potable Water Pumping Station For ( Berake El Khaiyam - Ezbet El Essaily ) Villages -Guiza Governorate .

• Execution of PUMPS Room In Baheeg Pumping Station To Feed 6th Districts With Water - New Borg El Arab City .

• Elevated Water Tanks To Feed Monshaet El Kanater City and Giza Governorate

• Networks Works For West of Nile Potable Water Plant - Kena Governorate .

◄ UTILITIES WORKS ;-

• Execution of (Potablewater - Sanitary Drainage - Irrigation ) Networks For (735 Feddane Zone ) At The Southern Expansions and Sub-Base For Services Area At New Souhage City .

• Execution of Utilities (Potablewater - Sanitary Drainage - Irrigation -Sub-Base For Roads ) For The Third and Fourth Residential District at New Qena City .

• Internal Infrastructure Works ( Road - Potablewater - Sanitary Drainage - Electricity ) For The Second Phase of The Leather City at El Robaiky .

• Infrastructure Works (Potablewater - Sanitary Drainage - Irrigation - Electricity - Communications - Civil Works ) For The First Priority Zone At New Administrative Capital .

• Utilities Works ( Roads - Potablewater - Electricity - Sanitary Drainage - ) For The Residential City In Front Of El-Rehab City At Cairo - Suez Road .

◄ ROADS :-

• The Second Stage of Roads in Some Areas of Build Your House Project (No. 1,2) in New Beni Swef City

◄ EDUCATIONAL BUILDINGS ;-

• Faculty of Tourism and Hotels at Menoufeya University - Sadat City

• Faculty of Veterinary Medicine - Sadat City - Menoufeya University

◄ MARINE WORKS :-

• El Obayed Shore Protection

• Construction Of A Third Beam For The Quay Wall Cranes - Dekheila Port Constainers Terminal .

• Construction Of A Quay Wall NO. 85-3 At Alexandria Port

• Second Stage Works For Abu Qir Marine Port Development Rroject .

© All rights reserved to Egyco
Design And Development By  MH Sites