Development of the old quay wall in Alex. Port - whose length was 450m -by the following :-
- Demolition of the existing breakwater with length (215m).
- Strengthening of the existing breakwater with concrete blocks with length (160m).
- Construction of main quay wall with length (294m) & depth (14m).
- Construction of secondary quay wall with length (75m) & depth (12m).
- Construction of the new breakwater with length (130m) & depth graded (12m : 4.5m).
|