Owner
:
Alexandria port authority
Execution status
President abdel fattah El- Sisi inaugurated the project on 7/9/2021 in the presence of the prime minister and minister of transport.new items are being assigned to the company with a value of 107 million L.E.
Project value
391 million L.E.
Description
Construction of a 430 m long concrete block berth, Draft 14.5 m.